The cost reduction is one of the most spread strategy adopted by companies for guaranteeing profits in a competitive market. This paper presents an approach for the cost optimization of industrial electrical routings. The proposed optimization process consists of two levels: the arrangement of the cables within the cable trays and the 3D routing of the cable trays for connecting the modules of a product. The arrangement of the power and signal cables and the selection of the cable trays are carried out considering specific configuration rules. A genetic algorithm, coupled with the Hightower's algorithm, is used to solve the routing optimization problem. The proposed cost functions consider the raw materials and manufacturing/assembly operations. The optimization process has been used for optimizing a portion of the electric cable harness of a 43 MWe power plant with a size of 44 × 20 meters, and a total of 40,60 kilometers of cables. The optimization process let to a cost saving of about 15% compared to the design carried out with the traditional approach. Abbreviations:CTs: cable trays; CUi: hourly rate for the installation phase [€/hour]; CUrmtk: hourly rate for the k-th cost center used for transforming a semi-finished component [€/hour]; Cut: hourly rate for the test phase [€/hour]; CUtray: unitary cost of a cable tray [€]; DOE: design of experiment; GA: genetic algorithm [€]; Ic: installation cost [€]; If: installation factor [-]; PAc: cost for the preliminary analysis [€]; PAcp: percentage used for calculating the cost of the preliminary analysis [%]; RMc: cost of the raw material and relative transformation operations [€]; RMcci: cost of the i-th commercial component [€]; RMoc: percentage of the overhead costs related to the management of the raw material [%]; RMsc_scrapsj: cost of the scraps for the j-th semi-finished component [€]; RMscj: cost of the j-th semi-finished component [€]; RMtc: cost for transforming semi-finished components [€]; Tcl: commercial length of a straight cable tray [meter]; Tii,j: standard installation time for the i-th or j-th component [hour]; Tl: linear distance between two points of the wiring system that need to be connected [meter]; Trmtk: time for the k-th operation for transforming a semi-finished component [hour]; Ttk: standard test time for the k-th skid of the electrical system [hour].

Castorani, V., Cicconi, P., Mandolini, M., Vita, A., Germani, M. (2018). A method for the cost optimization of industrial electrical routings. COMPUTER-AIDED DESIGN AND APPLICATIONS, 15(5), 747-756 [10.1080/16864360.2018.1441241].

A method for the cost optimization of industrial electrical routings

Cicconi P.;
2018-01-01

Abstract

The cost reduction is one of the most spread strategy adopted by companies for guaranteeing profits in a competitive market. This paper presents an approach for the cost optimization of industrial electrical routings. The proposed optimization process consists of two levels: the arrangement of the cables within the cable trays and the 3D routing of the cable trays for connecting the modules of a product. The arrangement of the power and signal cables and the selection of the cable trays are carried out considering specific configuration rules. A genetic algorithm, coupled with the Hightower's algorithm, is used to solve the routing optimization problem. The proposed cost functions consider the raw materials and manufacturing/assembly operations. The optimization process has been used for optimizing a portion of the electric cable harness of a 43 MWe power plant with a size of 44 × 20 meters, and a total of 40,60 kilometers of cables. The optimization process let to a cost saving of about 15% compared to the design carried out with the traditional approach. Abbreviations:CTs: cable trays; CUi: hourly rate for the installation phase [€/hour]; CUrmtk: hourly rate for the k-th cost center used for transforming a semi-finished component [€/hour]; Cut: hourly rate for the test phase [€/hour]; CUtray: unitary cost of a cable tray [€]; DOE: design of experiment; GA: genetic algorithm [€]; Ic: installation cost [€]; If: installation factor [-]; PAc: cost for the preliminary analysis [€]; PAcp: percentage used for calculating the cost of the preliminary analysis [%]; RMc: cost of the raw material and relative transformation operations [€]; RMcci: cost of the i-th commercial component [€]; RMoc: percentage of the overhead costs related to the management of the raw material [%]; RMsc_scrapsj: cost of the scraps for the j-th semi-finished component [€]; RMscj: cost of the j-th semi-finished component [€]; RMtc: cost for transforming semi-finished components [€]; Tcl: commercial length of a straight cable tray [meter]; Tii,j: standard installation time for the i-th or j-th component [hour]; Tl: linear distance between two points of the wiring system that need to be connected [meter]; Trmtk: time for the k-th operation for transforming a semi-finished component [hour]; Ttk: standard test time for the k-th skid of the electrical system [hour].
2018
Castorani, V., Cicconi, P., Mandolini, M., Vita, A., Germani, M. (2018). A method for the cost optimization of industrial electrical routings. COMPUTER-AIDED DESIGN AND APPLICATIONS, 15(5), 747-756 [10.1080/16864360.2018.1441241].
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11590/403011
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 4
  • ???jsp.display-item.citation.isi??? ND
social impact