Sfoglia per Autore
Optimal Flow Management in Flexible Assembly systems: The Minimal Part Transfer Problem
1996-01-01 Lucertini, M.; Pacciarelli, Dario; Pacifici, A.
Lot Scheduling in a Two Machine Cell with Swapping Devices
1996-01-01 Agnetis, A.; Pacciarelli, Dario; Rossi, F.
Batch Scheduling in a Two Machine Flow Shop with Limited Buffer
1997-01-01 Agnetis, A.; Pacciarelli, Dario; Rossi, F.
Assigning Jobs to Time Frames on a Single Machine to Minimize total tardiness
1997-01-01 Agnetis, A.; Macchiaroli, R.; Pacciarelli, Dario; Rossi, F.
Scheduling of Flexible Flow Lines in an Automobile Assembly Plant
1997-01-01 Agnetis, A.; Pacifici, A.; Rossi, F.; Lucertini, M.; Pacciarelli, Dario; Nicolò, F.; Oriolo, G.; Pesaro, E.
On a Generalized Assembly Line Balancing Problem
1997-01-01 Nicosia, G; Pacciarelli, Dario; A., Pacifici
Modeling an Assembly Line for Configuration and Flow Management
1998-01-01 Lucertini, M.; Pacciarelli, Dario; Pacifici, A.
Loading parts and tools in a flexible manufacturing system
1998-01-01 Pacciarelli, Dario
Integrating Layout Design and Material Flow Management in Assembly Systems
1999-01-01 Lucertini, M; Pacciarelli, Dario; A., Pacifici
A Three-dimensional Matching Model for Perishable Production Scheduling
1999-01-01 Arbib, C.; Pacciarelli, Dario; Smriglio, S.
Part Sequencing in Three Machine No-Wait Robotic Cells
2000-01-01 Agnetis, A.; Pacciarelli, Dario
Nondominated Schedules for a Job-Shop with Two Competing Users
2000-01-01 Agnetis, A.; Mirchandani, P. B.; Pacciarelli, Dario; Pacifici, A.
Parallel machine scheduling in a Flexible Manufacturing System
2001-01-01 Pacciarelli, Dario
Train Scheduling in a Regional Railway Network
2001-01-01 Mascis, A; Pacciarelli, Dario; M., Pranzo
A Tabu Search Algorithm for the Railway Scheduling Problem
2001-01-01 Pacciarelli, Dario; M., Pranzo
A branch and bound algorithm for the minimum storage-time sequencing problem
2001-01-01 Detti, P.; Pacciarelli, Dario
DSS for Real Time Traffic Optimisation
2001-01-01 Mascis, A; Pacciarelli, Dario; S., VAN DE STOUWE
Job Shop Scheduling with Two Jobs and Nonregular Objective Functions
2001-01-01 Agnetis, A.; P. B., Mirchandani; Pacciarelli, Dario; A., Pacifici
Set-up coordination between two stages of a supply chain
2001-01-01 Agnetis, A.; Detti, P.; Meloni, C.; Pacciarelli, Dario
The alternative graph formulation for solving complex factory scheduling problems
2001-01-01 Pacciarelli, Dario
Legenda icone
- file ad accesso aperto
- file disponibili sulla rete interna
- file disponibili agli utenti autorizzati
- file disponibili solo agli amministratori
- file sotto embargo
- nessun file disponibile