Industrial facilities release a large amount of heat as a by-product of their processes. To improve environmental performance and increase process profitability, a portion of the waste heat can be recovered and employed for power generation by recovery systems. Supercritical carbon dioxide (sCO2) plants are emerging as potential alternatives to the well-established technologies for waste heat recovery (WHR) power generation in heavy industry. This paper offers a preliminary techno-economic analysis of a waste heat-to-power system based on a sCO2 closed-loop for a heavy-industrial process. By conducting a parametric investigation on the WHR sCO2 system's key design parameters, a number of preferable configurations from a thermodynamic perspective were initially identified; they were subsequently analyzed from the economic point of view in terms of net present value (NPV) and pay-back period (PBP). The privileged WHR system configuration achieved an overall efficiency of 30.4% and a power output of 21.6 kWe, providing an NPV of almost US k$ 376 with a PBP of approximately 4.5 years.

Biondi, M., Giovannelli, A., Di Lorenzo, G., Salvini, C. (2020). Techno-economic analysis of a sCO2 power plant for waste heat recovery in steel industry. ENERGY REPORTS, 6, 298-304 [10.1016/j.egyr.2020.11.147].

Techno-economic analysis of a sCO2 power plant for waste heat recovery in steel industry

Biondi M.;Giovannelli A.
;
Di Lorenzo G.;Salvini C.
2020-01-01

Abstract

Industrial facilities release a large amount of heat as a by-product of their processes. To improve environmental performance and increase process profitability, a portion of the waste heat can be recovered and employed for power generation by recovery systems. Supercritical carbon dioxide (sCO2) plants are emerging as potential alternatives to the well-established technologies for waste heat recovery (WHR) power generation in heavy industry. This paper offers a preliminary techno-economic analysis of a waste heat-to-power system based on a sCO2 closed-loop for a heavy-industrial process. By conducting a parametric investigation on the WHR sCO2 system's key design parameters, a number of preferable configurations from a thermodynamic perspective were initially identified; they were subsequently analyzed from the economic point of view in terms of net present value (NPV) and pay-back period (PBP). The privileged WHR system configuration achieved an overall efficiency of 30.4% and a power output of 21.6 kWe, providing an NPV of almost US k$ 376 with a PBP of approximately 4.5 years.
2020
Biondi, M., Giovannelli, A., Di Lorenzo, G., Salvini, C. (2020). Techno-economic analysis of a sCO2 power plant for waste heat recovery in steel industry. ENERGY REPORTS, 6, 298-304 [10.1016/j.egyr.2020.11.147].
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11590/377259
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 8
  • ???jsp.display-item.citation.isi??? 6
social impact